Skip to main content

Set up Ledger Codes and Cost Centers

Learn how to create new ledger codes and cost centres in the Chart of Accounts, including available ledger types.

Cristina Gruita avatar
Written by Cristina Gruita
Updated this week

Set Up Ledger Codes

  1. Click Codes, then click Chart of Accounts.

  2. Select Ledger Codes.

  3. Click the plus icon to add a new ledger code.

  4. Enter the required information:

    • Ledger Code: Enter a unique ledger code.

    • Description: Enter a clear description for the ledger code.

    • Fund Code: Select a fund from the drop-down list. If funds are not used, the system fund is selected by default.

    • Report Code: Select a predefined report code from the drop-down list for standard reporting.

    • Ledger Type: Select a predefined ledger type from the drop-down list (see the Ledger Type Reference below).

    • VAT Code: Select the default VAT code for this ledger code, if required.

    • Bank Account: Tick this if the ledger code is a bank account.

  5. Click Save to create the ledger code, or Save and add another to create additional ledger codes.

πŸ“Œ Note: Only one active bank account ledger code is allowed.


Ledger Type Reference

Use this table to identify the correct ledger type and whether it appears on the Balance Sheet (BS) or Income & Expenditure (IE):

Ledger Type

Description

BS/IE

FXA

Fixed Asset

BS

AST

Asset/Stock

BS

BKC

Bank Control

BS

CRC

Creditor Control

BS

CAP

Capital

IE

DRC

Debtor Control

BS

SYE

Salary Expenditure

IE

EXP

Expenditure

IE

INC

Income

IE

LTL

Long Term Liability

BS

LIA

Liability

BS

PCH

Petty Cash

BS

PYC

Payroll Control

BS

RET

Retained Earnings

BS

VAT

VAT Control

BS

BDT

Bad Debt

IE

DRI

Inter-Company Asset

BS

CRI

Inter-Company Liability

BS

IXA

Intangible Asset

BS

PLI

Pension Liability

BS

πŸ“Œ Note: The DRI (Inter-Company Asset) and CRI (Inter-Company Liability) ledger types are used for central inter-company functionality.


Set Up Cost Centres

  1. Click Codes, then click Chart of Accounts.

  2. Select Cost Centres.

  3. Click the plus icon to add a new cost centre.

  4. Enter the required information:

    • Cost Centre: Enter the cost centre code.

    • Description: Enter the budget description for this cost centre.

    • Cost Centre Group: Select a cost centre group from the drop-down list to structure budget reports in your chosen format.

    • Budget Holder: Select the budget holder. This assigns them as the budget owner for the cost centre.

  5. Click Save to create the cost centre, or Save and add another to create additional cost centres.

Did this answer your question?